Hinskey Pool
LOCATION
Oxford, UK
DESIGNED TECHNOLOGY
580kW WSHP
PROJECT OVERVIEW
External public swimming pool heating between April and October, located in Hinksey Park. GeEnergy Design was commissioned by Oxford City Council. to do a stage 4 design, following successful PSDS funding.
Design Peak Heating Load 580kW ( 4 x ecoForest HP 25-100)
16,500m of 32mm of heat collector pipe in the lake (75 x slinkies)
Expected Seasonal COP 5.20
Heat collector pipe install (slinkies)
Heat collector pipe install.
Post installation
Site plant room