CASE STUDIES
A selection of historic GED projects, covering a varierty of sites and various heat pump technologies.
Filter Projects
Wythenshawe Forum
Detailed design of a cascade ASHP system with simultaneous heat recovery from existing chillers. RIBA 4-7.
Woodend Hospital - NHS Grampian
Hybrid ASHP and GSHP design with shared ground loop array. RIBA 3 design.
Manor House - Domestic
System design for a GSHP system integrated with a PV array in a Grade II listed domestic property.
Hinskey Pool
WSHP system, extracting from Hinskey Lake and serving the outdoor pools. RIBA 4.
Dorchester Primary School (HCAT)
Installation of a low carbon heat source and supplementary PV array.
Cameron Hospital - NHS Fife
RIBA 3 detailed design of heat pump system with ground loops and ‘de-steaming’ of entire site.
Rapley’s Pool House
Concept and specification of a combined GSHP and Solar PV-T system. RIBA 3.
Borders General Hospital - NHS Borders
Detailed design of a shared ground source heat pump system and ‘de-steaming’ of satellite buildings. RIBA 3.