CASE STUDIES
A selection of historic GED projects, covering a varierty of sites and various heat pump technologies.
Filter Projects
Wythenshawe Forum
Detailed design of a cascade ASHP system with simultaneous heat recovery from existing chillers. RIBA 4-7.
Woodend Hospital - NHS Grampian
Hybrid ASHP and GSHP design with shared ground loop array. RIBA 3 design.
Dorchester Primary School (HCAT)
Installation of a low carbon heat source and supplementary PV array.
Cameron Hospital - NHS Fife
RIBA 3 detailed design of heat pump system with ground loops and ‘de-steaming’ of entire site.